Skip to main content
Home

Main menu

  • About
  • 10
  • 25
  • 50
fr
EnglishFrançais

User account menu

  • log in

Main navigation

  • About

User account menu

  • log in
  1. bucknell
  2. Nelson F. Davis Photography Collection
  3. Panama Canal Construction Photographs

Panama Canal Construction Photographs

  • 10
  • 25
  • 50
  • About Nelson F. Davis
  • Bridge Images
  • Panama Canal Images
  • Yellowstone Images
Ownership
  • Projet
  • Nelson F. Davis Photography Collection (134)
Type
  • Basic Image (134)
    List Grid

    Pagination

    • « First page
    • ‹ Previous page
    • Page 2 OF 3
    • › Next page
    • » Last page
    • 10
    • 25
    • 50
    The Cathedral Plaza, Panama, circa 1910
    Lidgerwood Unloader - 14% Grade - Tabernilla Dumps
    Cucaracha Slide, North End. From West Bank
    Bottom of the Canal
    Culebra Cut
    Miraflores Upper Locks, Looking South, Construction of East Side Wall, Showing Culvert, November 10, 1910
    Pedro Miguel Lock, The West Chamber, Looking North, November 11, 1910
    Pedro Miguel Lock, Looking South from Forebay, November 9, 1910
    Pedro Miguel Lock. Concrete Mixers, Loading Concrete in Buckets. November, 1910
    Slide of Stratified Rock, West Bank of Canal, Culebra-on-the-Dump
    Culebra Cut, Empire. Break in East Bank at La Pita, taking in Pbispo Diversion Channel
    Miraflores lower locks, General view from Berm Crane on east bank
    Gatun Upper Locks. Miter gate moving machine
    Gatun Upper Locks
    Culebra Cut, Culebra
    Pedro Miguel Locks. East Chamber
    Unnamed picture of a small town on a hillside overlooking the ocean, apparently near one end of canal
    Culebra Cut, Culebra. View looking South, from East Bank, Showing Terraces formed in removing superimposed weight from top bank of Canal
    Gatun Lower Locks. East Chamber
    Gatun Spillway
    Mindi Excavation
    The Cut at Bas Obispo during the Flood of Nov.19, 1909
    Blowing up of Gamboa dike, Panama Canal, October 10, 1913
    General View of Ancon Hill and Quarry from Sosa Hill. June 7, 1912
    Miraflores Lower Locks
    Culebra Cut. Cucaracha Slide
    Gatun Upper Locks
    A French Land excavation and Bridge Conveyor near Tabermilla 160ft
    Culebra Cut, Culebra
    Pedro Miguel, Showing I.C.C. Mess Hall and Family Quarters, 1911
    Pedro Miguel Locks
    Steam Shovel No. 254 Flooded by Heavy Rain in Pioneer Cut, Culebra, October 2, 1911
    Steam Shovel No. 225 wrecked by Rock Slide
    City of Panama, from Ancon Hill
    Miraflores Upper Locks
    Lateral Culvert Forms and Floor, Miraflores Lock, July, 13, 1910
    Gatun Upper Locks
    Hydraulic Excavation, Miraflores
    Hydraulic Excavation, Miraflores
    Gatun Lower Locks
    Water flowing into Culebra Cut from Gatun Lake
    Gatun Lower Locks
    Sea level section south of Miraflores locks
    Gatun Upper Locks
    Tivolo Hotel, Ancon. Front View
    Culebra Cut
    Gatun Upper Locks
    Gatun Locks
    Gatun Lower Locks
    Upper Gatun locks, east chamber, looking south. November 1, 1910

    Pagination

    • « First page
    • ‹ Previous page
    • Page 2 OF 3
    • › Next page
    • » Last page

    Footer

    • Contact