Balboa Terminals
General View of the machine, erecting, and tool shops. Forge shop, steel storage and boiler shop. Oct. 7, 1913
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Operation of Gatun Locks
First boat through. Tugboat "Gatun" entering lower lock, west chamber. Looking south from fore bay. Sept. 26, 1913.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Panama Railroad Depot, City of Panama. Oct. 16, 1913
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Isthmian Canal Commission Map showing Isthmus with completed
Canal
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Pedro Miguel locks - Control House
Switchboard ready for test March 19, 1914.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Operation of Gatun Locks
Class "C" submarines and "Severn" (tender) in upper east chamber ready to be lowered. April 15, 1914
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Operation of Gatun Locks
East Emergency dam subjected to head of 30 ft. of water. May 6, 1914.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Operation of Gatun Locks
North from center wall lighthouse S. S. Alliance in upper west chamber, water Elevation 56.6 June 8 1914.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Operation of Miraflores Locks
S. S. Santa Clara in lower west chamber ready for water to be lowered to sea level. Looking north. June 19, 1914.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)
Opening of the Panama Canal
S. S. Ancon in west Chamber, Gatun upper locks. Looking South, Aug. 15, 1914.
Handy (Photographer), Hallen (Photographer), Special Collections/University Archives (Publisher)