Skip to main content
Home

Main menu

  • About
  • 10
  • 25
  • 50
en
EnglishFrançais

User account menu

  • log in

Main navigation

  • About

User account menu

  • log in
  1. Confluence
  2. Nelson F. Davis Photography Collection
  3. Panama Canal Construction Photographs

Panama Canal Construction Photographs

  • 10
  • 25
  • 50
  • About Nelson F. Davis
  • Bridge Images
  • Panama Canal Images
  • Yellowstone Images
Ownership
  • Project
  • Nelson F. Davis Photography Collection (134)
Type
  • Basic Image (134)
    List Grid

    Pagination

    • Page 1 OF 3
    • › Next page
    • » Last page
    • 10
    • 25
    • 50
    Ancon Hospital
    I.C.C. Sanitarium, Taboga Island
    Men of color standing on a porch, eating
    Ruins of a Sentry Box, Old Panama, March 1907
    Street of unknown town in Panama, all dug up
    Graphical representation of yardage, Panama Canal, July 1, 1913
    Geological cross-sections of Culebra Cut, showing sliding ground
    Isthmian Canal Commission - Atlantic Division general map: Gatun Locks and Dam
    Isthmian Canal Commission, Pacific Division, Pedro Miguel to Panama Bay, (map of west end of canal, and Excavation Diagram)
    Isthmian Canal Commission - Atlantic Division Sections of Gatun Dam
    Tropical Foliage near Bohio
    Blast at Bas Obispo, Sept. 19, 1907 (1/3)
    Blast at Bas Obispo, Sept. 19, 1907 (2/3)
    Blast at Bas Obispo, Sept. 19, 1907 (3/3)
    Old French Excavation in cut near Empire
    Cucaracha Slide
    Black man standing beside a railroad derrick on curved tracks
    View of Culebra from Reservoir, showing Administration Building to left, hotel to the right and Y. M. C. A. Club House in center
    An Isthmian Canal Commission locomotive
    Old French Ladder dredge, August 7th, 1907
    Dinner Time at a Commission Hotel, Gorgona
    A woman and a girl standing in a damaged street in an unnamed town
    Comacho Diversion Tunnel, Bas Obispo, May 22, 1908
    General View of Ancon Hospital
    Suspension bridge across cut at Empire
    The cut at Bas Obispo during flood of Nov. 12, 1909
    Wrecking cranes freeing steam shovel No. 231 from Cucaracha slide, Oct. 4, 1909
    Gatun Spillway looking north, April, 1910
    Culebra cut
    Berm crane at Pedro Miguel Lock, June, 1910
    Gatun Dam, hydraulic fill, July, 1910
    Pedro Miguel Locks.April 6, 1910
    Gatun upper locks and forebay, looking north. November 1, 1909
    Upper Gatun locks, east chamber, looking south. November 1, 1910
    Pedro Miguel Lock. Concrete Mixers, Loading Concrete in Buckets. November, 1910
    Pedro Miguel Lock, Looking South from Forebay, November 9, 1910
    Pedro Miguel Lock, The West Chamber, Looking North, November 11, 1910
    Miraflores Upper Locks, Looking South, Construction of East Side Wall, Showing Culvert, November 10, 1910
    Culebra Cut
    Bottom of the Canal
    Cucaracha Slide, North End. From West Bank
    Lidgerwood Unloader - 14% Grade - Tabernilla Dumps
    The Cathedral Plaza, Panama, circa 1910
    Culebra Cut at Empire
    Hydraulic Excavation, Miraflores
    Hydraulic Excavation, Miraflores
    Gatun Upper Locks
    Lateral Culvert Forms and Floor, Miraflores Lock, July, 13, 1910
    Miraflores Upper Locks
    City of Panama, from Ancon Hill

    Pagination

    • Page 1 OF 3
    • › Next page
    • » Last page

    Footer

    • Contact Confluence
    Bucknell logo